ELECTRICAL & INFRASTRUCTURE PROJECTS ACROSS WA

  • Bore pump installation for water infrastructure at Busselton Water project

    BUSSELTON WATER BORE 18 PROJECT

    PCI Electrical Services was engaged by Busselton Water to install and commission their new Bore 18 facility. Consisting of a 630A SMSB, VSD control cabinet, 200kW submersible pump and pressure, level and flow transmitters.

  • Electrical and communications design and installation for West Angelas A Hub Office complex

    RIO TINTO WEST ANGELAS A HUB COMPLEX

    PCI Electrical Services completed all Electrical and Communications design and installation for West Angelas A Hub Office complex. Included in the works was the design of a 630A SMSB with auto changeover system to backup generator. PCI Electrical Services also completed all the arc flash intertrip design and installation to upstream HV recloser.

  • Rio Tinto mine site illuminated by large street lights at night for operational safety

    RIO TINTO ROBE VALLEY SUSTAINING PROJECT

    PCI Electrical Services were awarded all Non Process Infrastructure Electrical and Communications works at Mesa A Mesa BC, Mesa J, Mesa H and Pannawonica. Encompassing 9 separate sites with a project duration of 3 years and over 17,000 man hours.

    The completion of these works allowed for Rio Tinto to provide the necessary office, water, tool stores and LV/HV parking so they can execute their mining works for their Robe Valley minesites. PCI Electrical Services were formally recognised by Rio Tinto and Calibre Professional Services for our outstanding Safety and Performance in complex Brownfields and Greenfields sites.

  • Mine site dome shelter at Rio Tinto providing worker protection and environmental shelter

    RIO TINTO WEST ANGELAS DEPOSIT C SHUTPAD

    PCI Electrical Services completed all design, installation and commissioning for Rio Tinto Iron Ore West Angelas Deposit C Shut Pad. Works included the replacement of an existing Distribution Board, refurbishment of a Distribution Board and all general power and lighting.

  • Large-scale agricultural irrigation system setup for efficient crop watering

    WATER CORPORATION - WASTE WATER TREATMENT PLANT BROOME

    PCI Electrical Services completed the installation and the redesign of the control for Broome Water Corporation Wastewater Centre Pivot which irrigates the city of Broome’s wastewater. The redesign of the control included the operation of the centre pivot as well as the interface with the Water Corporation’s SCADA system via telemetry.

  • Control system for upgrading Soft Starters to VSDs for Busselton Water project

    BUSSELTON WATER - BORE PUMPS VSD PROJECT

    PCI Electrical Services has completed the upgrade of 4 Soft Starters to VSD’s across 5 separate sites for Busselton Water. The installation required a redesign of the existing control wiring, cooling design requirements, harmonic design mitigation and VSD sizing.

  • Skid-mounted pump packages for fluid management and water systems

    DUNSBOROUGH TOWN POS WATER PROJECT

    PCI Electrical Services was engaged by the City of Busselton to design their new pump station and bores for the irrigation of all the POS spaces in Dunsborough. The project included the design and installation of a pump control cabinet to control 4 pumps via cascade control as well as two bores with remote monitoring and radio communications control for tank level filling.

  • Control system for upgrading Soft Starters to VSDs for Busselton Water's supply system

    BUSSELTON WATER - TRANSFER AND DELIVERY PUMPS VSD PROJECT

    PCI Electrical Services has completed the upgrade of 17 Soft Starters to VSD’s across 4 separate sites for Busselton Water. The installation required a redesign of the existing control wiring, cooling design requirements, harmonic design mitigation and VSD sizing. All works had to be meticulously planned and executed to ensure the capacity of Busselton Water to supply drinking water to the City of Busselton.

  • Bore pump installation for Rio Tinto's Western Ranges Project, including submersible pumps and transmitters

    RIO TINTO WESTERN RANGES PROJECT

    PCI Electrical Services was engaged by Welltech and PPS Group to install and commission 6 Production Bore Skids at Rio Tinto Iron Ore’s Western Ranges Project. PCI Electrical Services commissioned all aspects of the works including submersible pump, level, flow and pressure transmitters, safety relays, solar and HMI setpoints.